KACTS - Current Projects

Kittery Area Comprehensive Transportation System 

 

      Main Page          Meetings Maps              Documents          Projects       

 

 

Sarah Long Mildred Bridge, Kittery & Portsmouth (NH)

Project Description:

Complete replacement of the Route 1 Bypass bridge over the Piscataqua River on the Maine - New Hampshire Border

For more information on this project, please visit the MaineDOT project website by clicking here.

 

Route 236 & Depot Street, Eliot

Project Manager(s):

Robert Betz, MaineDOT

KACTS Contact:

This email address is being protected from spambots. You need JavaScript enabled to view it. , SMPDC

Project Description:

At the signalized intersection of Route 236 and Depot Road in Eliot, widen the intersection to provide a second through lane in each direction on Route 236 to reduce traffic congestion.

Estimated Cost:

$2,525,000.00

Engineering / Design Firm(s):

 

Project Schedule:

 

 

Kittery Memorial Circle, Kittery

Project Manager(s):

Brian Keezer, MaineDOT

Norman Albert, Commissioner of Public Works, Town of Kittery

KACTS Contact:

This email address is being protected from spambots. You need JavaScript enabled to view it.  SMPDC

Project Description:

Memorial Circle improvements including design and construction of ramps and upgrading pedestrian and bicycle infrastructure around the circle and along the Route 1 bypass.

Estimated Cost:

$2,304,529.00

Engineering / Design Firm(s):

Wright-Pierce & Gorrill Palmer

Project Schedule:

Project is scheduled to be advertised in September 2016

 

Walker Street & Wentworth Street (Route 103), Kittery Foreside

Project Manager(s):

Brian Keezer, MaineDOT

KACTS Contact:

This email address is being protected from spambots. You need JavaScript enabled to view it. , SMPDC

Project Description:

Paving & sidewalk widening beginning at Walker Street 0.09 of a mile west of Main Street & extending east 0.31 of a mile to Wentworth Street, paving & sidewalk improvements extending north from Walker Street Ext 0.19 of a mile to Whipple Road, and upgrading the signal at Walker Street and Wentworth Street.

Estimated Costs:

$913,053.99

Engineering / Design Firm:

T.Y. Lin International

Project Schedule:

Preliminary Engineering / Design has begun.

 

Route 236 & Academy Street Intersection, South Berwick

Project Manager(s):

Brian Keezer, MaineDOT

KACTS Contact:

This email address is being protected from spambots. You need JavaScript enabled to view it. , SMPDC

Project Description:

Relocating Academy Street connector further to the north on Route 236. Construction of left turn lane for Vine Street and Academy Street connector. Constructing raised medians and reducing the speed limit to 35 MPH.

Estimated Costs:

 $807,700.00

Engineering / Design Firm:

 CLD Engineers

Project Schedule:

Bid awarded to Brown Industrial Group on February 26, 2016. Construction to be completed in Summer 2016

 

York Village, York

Project Manager(s):

Gerry Audibert, MaineDOT

Dean Lessard, Public Works Director, Town of York

KACTS Contact:

This email address is being protected from spambots. You need JavaScript enabled to view it. , SMPDC

Project Description:

Located at the intersection of Route 1A and Long Sands Road. This project will consist of realigning the intersection at Route 1A (York Street) and Long Sands Road, drainage improvements, and then relocating the Joshua Chamberlain statue currently in the middle of the intersection to a new park, where people can safely visit the statue.  

Estimated Costs:

$810,000.00

Engineering / Design Firm:

 

Project Schedule:

Preliminary Engineering / Design has begun.